July 14th @ 3 p.m.
Harvesting begins with 2 teams of 4
harvesting for a straight 24 hours.
July 15th @ 11:00 a.m.
18 tractor trailers loaded with fresh sod will enter from underground up to the field to begin laying sod.
Each tractor trailer holds 46 rolls, each roll measuring in at 35 feet long.
The team consists of 19 install workers, 11 tractor trailer drivers and a number
of forklift operators, maintenance and watering crews.
July 16th @ 7:00 p.m. GAME TIME
The players take the field. An install crew will be standing by for any quick fixes that may be needed.
July 16th @ 10:00 p.m.
As the players leave the stadium our crews will be removing the sod. The used sod
will be brought back to the field and tilled under to be used as nutrients for future rolls. |